








SCHÜLERWOHNHEIM DINGOLFING
New construction of a four-storey student residence with 85 rooms in modular timber construction
Location | Dingolfing |
Client | Landratsamt Dingolfing-Landau |
Floor Area | 4.780 m² |
Units | 85 |
Completion | 2024 |
Procurement | Direct commission |
Project Team | LiWooD Management AG |
Phases | 3–4 |
The district administration office of Dingolfing-Landau commissioned a student dormitory in modular timber construction for its vocational school in Dingolfing, accommodating approximately 85 students. The new building was built on the existing parking lot directly in front of the vocational school and was elevated in such a way that a large part of the parking spaces could be preserved.
The new structure consists of a four-story student dormitory with 58 residential units, providing living space for approximately 85 students, complemented by a cafeteria and various communal spaces on the third floor.
The ground floor was constructed in reinforced concrete and houses covered parking spaces, stairwells, technical rooms, and the main entrance area. The three upper floors were built using solid timber construction, with room modules prefabricated on-site in a field factory. A distinctive feature of the building is the spacious gallery within the four-story section, as well as the sculptural façade composed of glass fiber-reinforced concrete elements.